Administration building Passau

As general contractor for the roof construction, WIEHAG was responsible for the roof and wall panels and the façade of the new Passau city administration building.
The project: An extension to an existing building. The trick here: The clean connections of the roof elements to the solid walls.
THE PROJECT

A SUSTAINABLE BUILDING

As a sustainable building in passive house standard, the existing former Telekom building was extended by a new building arranged perpendicular to it and a 2nd floor was added. The existing building was additionally refurbished in terms of energy efficiency. All new additions are made of timber frame construction with a view to special sustainability. The building's electricity needs can be largely covered by the PV system on the roofs. The entire facility was constructed as a two-storey, partly three-storey timber building.

The 2,000 m2 roof area, consisting of 4 components, was constructed as a flat pitched monopitch roof hall with conically cut element ribs with a height of up to 88 cm. All roof and wall components were prefabricated as elements in the factory. A special challenge was the connection of the roof elements to the solid walls, parapet formations and component transitions, which were already defined in the planning phase with all the necessary details.

Verwaltungsgebäude Passau

The columns were constructed as glulam columns. Approx. 150 m3 of glulam was used in the entire project. Approx. 1,500 m2 of cross laminated timber ceilings were installed for the intermediate ceiling areas. Steel lattice girders were also used to support the intermediate cross-laminated timber ceilings and to install a gallery in the transition area between the extension and the new building. Inside, the timber construction has remained visible on the exterior walls and ceilings of all offices as well as in the entrance hall. This was not possible in the necessary corridors and staircases for fire protection reasons. The approx. 750 m2 façade of the new building was designed as a curtain-type wooden façade with horizontal larch strips.  As a contrast, the façade of the existing extension was made with HPL façade panels.

ADMINISTRATION BUILDING PASSAU
Project profile
Location
Passau
Client
Passau District Administration Office
Architecture
Reiszky Architekten
Type of construction
Bearing system, roof and wall panels
Roof area
2,000 m²
Facade area
750 m²
Glulam volume
150 m³
Cross laminated timber volume
1,500 m²
References

Discover other WIEHAG references

Skip slider
  • Logistics, retail, industry
Bakery Kasprowicz
  • Logistics, retail, industry
Weingut Nett
  • Logistics, retail, industry
Thalmeier Joinery
  • Culture, Sports and leisure centres
Center Parcs Ballymahon
  • Multi-storey timber construction
IBRB University of Warwick
  • Culture, Sports and leisure centres
Neuschönau tree tower
Jump to slider start
YouTube is deactivated

We need your consent to use YouTube videos. For more information, see our Privacy Policy.

Vimeo is deactivated

We need your consent to use Vimeo videos. For more information, see our Privacy Policy.

Google Maps is deactivated

We need your consent to use Google Maps. For more information, see our Privacy Policy.