Logistics hall at the Skandinavienkai
A large-scale project at the port of Lübeck
Skandinavienkai in Lübeck is the largest ferry port on the Baltic. In 2019, the Lübeck Port Authority (LPA) commissioned construction of a 300 m long, 120 m wide and 15 m high logistics hall. The bearing system and the roof and wall panels had to be made of timber. This required a total of:
- 31 double tapered beams with a length of approx. 28 m
- 31 fish-bellied girders with a length of approx. 43 m
- 31 fish-bellied girders with a length of approx. 48 m
- 16 parallel beams with a length of approx. 48 m
- Approx. 18,000 metres of bracing and tension bars
Logistics from WIEHAG
WIEHAG supplied the components for the roof supporting structure and the wall construction. Numerous special transports and extra-long transports were required for this purpose:
- 32 special transports and 28 standard transports or extra-long transports up to 24 metres for the roof structure
- 5 extra-long transports up to 22 metres for the wall construction
The total delivery time was seven weeks. The components were assembled by Mohrmann Bau GmbH.