CUBE HOUSE
Amsterdam
Where sustainability
meets well-being
In addition to its WELL Gold-certified indoor climate, the first hybrid timber building at Zuidas features an exceptional rooftop garden, three 'breathing spaces' to connect indoor and outdoor areas, and a publicly accessible ground floor ('The Cube') promoting well-being and sustainability.
The CubeHouse will generate approximately 80% of its energy from PV panels and will be made up of 75% sustainable materials, primarily wood from managed forests.
The CubeHouse’ frame is built primarily using recycled and/ or biobased materials, mainly timber originating from sustainably managed forests.
First Hybrid Timber Building
at Zuidas in Amsterdam
WIEHAG was awarded the contract for the entire design, manufacturing of the Glulam and CLT elements, as well as the delivery and assembly of this 13-story masterpiece. The assembly will commence in August 2024, marking a significant milestone for Zuidas and Amsterdam.
- Client
- Visser & Smit Bouw, Rotterdam
- Architect
- SO-IL, New York
- Timber Engineering, Assembling
- WIEHAG Timber Construction
- Floors
- 13
- Area
- 16.300 m²
- Completion
- End of 2025