AMAG Austria Metall AG
The largest industrial construction site in Austria in 2016. The cold rolling mill at Austria Metall AG in Ranshofen, Upper Austria.
WIEHAG designed, produced and assembled over 2,800 timber parts for the large-scale project.
The project in figures
- 540 m long
- 200 m wide
- 26 m high
- 50,000 m² roofed area
- 6,000 m³ glued laminated timber
- 172 double tapered beams
- 160 alternating girders - approx. 2,800 timber structural components
- approx. 50 tonnes of steel parts and fasteners
- 100 special transports with a total length of 46 metres
- Location
- Ranshofen (AT)
- Client
- AMAG Austrian Metall AG
- Services provided
- Bearing system
- Record
- Largest industrial construction site in Austria 2016
- Construction period
- 7 months